It's during Golden Week, but today I would like to report on the production status of Growth Peak 3, which is currently accepting reservations. 。 

I went to the second inspection during the production, so I will send you the contents along with the photos of the previous first inspection.ます。

 

First of all, I will check the finished product, which is this pictureす。

 

This is still unfinished, so I put it in this shape to sew it inside out.す。

 

Here is how to connect the back side。

 

and here is the inside。

 

It is sewn inside out。

 

It is in a situation where it is placed immediately after sewing。

 

100% inspection after all production is completedい、

 

I will leave it out to fix if there is a problemす。

 

When finished, pack it in a box and you're done。

 

The inspection has been completed without any problems, and the packaging has been completed.す。

The schedule will be sent to the distribution warehouse in Japan at the end of Golden Week, and the products will be sent to everyone from there.It looks like we will be able to deliver the products in late May as planned.です。 

Please wait a little longer until delivery。

 